NEW QUESTION 71
You are the product manager at a paint manufacturing company. Paint base is produced in 100 gallon batches.
The paint base can be packaged in 1 gallon, 5 gallon, and 10 gallon containers.
You want to use consolidated batch orders for the bulk paint base item. You need to set up the items and formulas to allow for consolidated batch orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 72
You manage pricing for a food processing company. The raw materials used by the business is a commodity-traded product and has a changing purchase price.
You must implement the commodity pricing module. You create a pricing template with margin data.
You need to calculate the cost price for the manufactured goods as well as the sales price based on margin standards.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

 

NEW QUESTION 73
You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.
You need to set up a new item for the car audio system.
How should you create the new product? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 74
You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish.
You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.
You have set up the default Start user options for all production orders as shown in the exhibit below.

Answer:

Explanation:

Explanation

 

NEW QUESTION 75
A company uses Dynamics 365 Process manufacturing.
Employees work a half day so that they can attend a company event. You have a rush order that must be completed that same day.
After reviewing the net requirements of the batch order, only 400 of the total quantity of 1400 units must be completed today. The production manager must retain the original batch number as the quantity of 400. The original batch number must appear on documentation for the customer.
You need to split the batch order into two orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - Select the batch order.
2 - Select Split
3 - Enter 1,000 in the split quantity field.

 

NEW QUESTION 76
A customer produces light projection toys for holiday decorations throughout the year.
You must implement Bills of material (BOMs) for the product lifecycle. The solution must meet the following requirements:

You need to create a BOM for each phase.
Which BOM types should you use? To answer, select the appropriate configuration options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 77
You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.
You need to set up a new item for the car audio system.
How should you create the new product? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 78
A company produces pipe at certain fixed lengths.
The company must be able to schedule cutting machines. You set up the cutting machines as resources. All cutting resources can produce many of the products. There are some products that require cutting machines that can produce longer lengths of product. Only some of the machines can do this.
You need to configure the resources to account for these different products.
What should you do?

  • A. Create a resource for each length.
  • B. Create a resource group for each length.
  • C. Configure the Data/Hour option on the Capacity unit field on the resource.
  • D. Build capability related to length and assign to the appropriate resources.

Answer: D

 

NEW QUESTION 79
A company produces light projection toys for holiday decorations. The company plans to implement Lean manufacturing processes.
Production master data must meet the following requirements:
* Visual templates for a holiday must only be included for in-store products where that holiday is celebrated
* Visual templates for a holiday must only be included for in-store products based upon that season
* Online customers must be able to order visual templates for any holiday or region.
You need to implement production master data.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 80
A company produces multiple products that require an installation kit that includes 50 components.
The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order.
You need to set up the product BOM for the finished good.
What should you do?

  • A. Change the line type to Pegged supply.
  • B. Change the line type to Phantom.
  • C. Select Phantom on the engineering fast tab on the kit item.
  • D. Change the coverage group on the kit item to Manual.

Answer: B

 

NEW QUESTION 81
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company produces and distributes seafood to supermarkets. During the manufacturing process, raw seafood is purchased, cleaned, and packaged into various-sized boxes. Each box may have a different weight.
Product is sold by the box and priced by the pound.
You need to ensure that you can perform transactions at the box level and record the net weight of goods shipped to a customer.
Solution: Set up the product with a sales unit measure of pounds and inventory unit measure of box. Set a standard unit conversation for the product from box to pounds.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

Explanation:
Explanation/Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-catch-weight-items Create and manage production and lean orders Testlet 2 This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other question on this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question on this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.
Background
General information
A manufacturing company produces custom configured-to-order motorcycles. The company plans to implement Dynamics 365 Supply Chain Management. The company contains one legal entity located in Missouri where all production and warehousing operations occur.
Customization options
The custom motorcycles have a variety of selections that can be selected in the listed order by the end customer, including the following:

Current environment
Customization restrictions
The following restrictions on customizations are in place:
* Green color can only be sold with the Legend Trim.
* Orange color can be sold with the Sport or Legend Trim.
* The ML seat must be included in the Legend package.
* The MS seat must be included in the Sport package.
Manufacturing facilities
The company includes the following manufacturing groups: Assembly and Plastic Molding. The Assembly group is responsible for assembling the motorcycles with purchased and manufactured goods. The Plastic Molding group is responsible for manufacture of all plastic parts used in the assembly area.
Motorcycle manufacturing
The parts for the product assembly are picked from the warehouse and staged at the correct workstation by a warehouse operator for each production order.
Plastic manufacturing
Plastic parts are molded using dyes that create multiple parts at once. The parts are machined in the same production process to remove excess plastic and add additional holes for assembly. Excess plastic is recycled back into the feedstock of the same color plastic chips for use in the molding process.
Metal parts
Raw metal parts are purchased fully machined but without primer or paint. The parts are subcontracted to a vendor for primer and paint based upon the color requirements.
Facility
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Requirements
Sales orders
The company has the following requirements for sales orders:
* During the configuration of a sales order, invalid combinations must be prevented.
* Each configuration must create a unique bill of material (BOM) and Route based on options selected.
* Sales pricing for the sales order must be based upon options selected.
* Due to emissions regulations, the motorcycles cannot be sold to the state of California.
Motorcycle manufacturing
The company has the following requirements for motorcycle manufacturing:
* Schedule labor only at the labor pool level without machines by day.
* Produce motorcycles within a scheduled day in any order.
* Record actual production labor with start/stop times.
* Record manager approval of labor entered prior to posting.
* Post actual material consumption after production is finished.
Plastic manufacturing
The company has the following requirements for motorcycle manufacturing:
* Schedule both labor and machines.
* Adjust schedules by using a Gantt chart.
* Backflush standard labor by operation.
* Post actual material consumption at the start of production.
* Track and allocate costs to the excess plastic.
* Report multiple molded part numbers during the same production run.
* Determine the correct mold to use on a production order.
* Generate a batch number for each production order.
Metal parts
The company has the following requirements for metal parts manufacturing:
* Schedule shipments to the vendor for painting.
* Receive painted parts into inventory from the vendor.
* Track vendor inventory levels.
Defaults
You must configure defaults for manufacturing execution production orders to meet the following requirements:
* Ensure accuracy for production order pick list posting.
* Ensure correct pick list creation.
Issues
* In the current system, the company cannot calculate overhead rates and determine the breakdown of material, labor, machine, and overhead costs for production.
* The company is manually calculating an 8% overhead on materials and posting a journal manually.
Create, process, and manage production batch orders
Question Set 1

 

NEW QUESTION 82
A process manufacturing company is implementing Dynamics 365 for Finance and Operations. The company will use multiple process manufacturing functionalities including by-products.
You need to configure by-product formula allocation methods.
Which methods should you use? To answer, drag the appropriate by-product burden allocation methods to the correct scenarios. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 83
A company uses Dynamics 365 for Finance and Operations for Process manufacturing.
Employees spend considerable time cleaning and setting up machines in a specific area between production orders. You must group production activities to optimize cleaning and set up time.
You need to set up the system.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: More than one order of answer choices is correct. You will receive credit for any of the correct orders you select.

Answer:

Explanation:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/set-up-product-sequences

 

NEW QUESTION 84
A Discrete manufacturing company produces speakers. The high-end speaker model uses protective rubber strips on the edges.
Approximately five inches of rubber is consistently scrapped in the production process, regardless of production quantity. Workers manually consume the extra material on the picking list or scrap it in an inventory journal. k You need configure the system to automatically account for this scrap on the Bill of materials (BOM).
What should you do?

  • A. Add an additional BOM line for five inches and set consumption to Variable.
  • B. Set a Variable scrap of five percent for the rubber BOM line.
  • C. Increase the required quantity of the rubber component by five on the BOM.
  • D. Set a Constant scrap of five on the BOM line for rubber.

Answer: A

 

NEW QUESTION 85
A manufacturing plant uses Lean manufacturing. Operators process Kanban consumption manually by using a mobile device.
The production team must use automatic empty registration for some of the event Kanbans. Registration must occur when the last job of a Kanban is completed.
You need to update the Kanban rule to meet this requirement.
What Kanban setting should you update?

  • A. Select to manually register as empty.
  • B. Select to register as empty when the source requirement is registered.
  • C. Select to register as empty when handling units are received.
  • D. Set a fixed Kanban quantity.

Answer: C

 

NEW QUESTION 86
You are the production scheduler for a manufacturing company. You have run the Resource Group Capacity report as shown in the Resource Group 21 Capacity exhibit. (Click the Resource Group 21 Capacity tab).

After reviewing that report, you run Resource Capacity reports as shown in the Resource 2101 and 2102 Capacity exhibits. (Click the 2101 Capacity and 2102 Capacity tabs.)

You run the Gantt chart report as shown in the Gantt exhibit to determine the production orders scheduled on the resources. (Click the Gantt tab.)

You need to determine the method to schedule the production lines.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 87
An inventory control clerk manages adjustments in inventory.
Some adjustments have a cost impact. Other adjustments must be posted to a specific ledger account or must be registered in inventory.
You need to configure the system.
Which journal types should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 88
You need to modify the production order defaults for the manufacturing execution production order Start process.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 89
A company plans to implement Dynamics 365 for Finance chain Operations.
You need to determine which manufacturing solutions to use.
Which manufacturing solution should you use? To answer, drag the appropriate setting to the correct drop targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 90
You are the lead product design manager at a Process manufacturing plant.
You are building a formula that produces egg yolks as a by-product. This by-product is added back into inventory at standard cost and can be used in other production batches.
You need to select the by-product cost allocation.
Which cost allocation type should you use?

  • A. Per quantity
  • B. Per series
  • C. Recycled
  • D. Percent

Answer: A

 

NEW QUESTION 91
A company makes engine parts used in the automotive industry.
They are in the process of retooling an existing manufacturing plant. They are looking to use Dynamics 365 for Finance and Operations to help support the Bill of Materials (BOM) product lifecycle for engineering version control.
You must translate existing production processes into the proper elements. You need to create BOM lifecycle states to translate existing production processes into the proper elements.
What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.

Answer:

Explanation:

Explanation

 

NEW QUESTION 92
A company makes lubricants and greases used in the automotive industry. The company plans to implement Dynamics 365 for Finance and Operations. The system must meet the following requirements:
* Schedule the batch production of products.
* Plan for inventory fluctuations of ingredients that are used across different products.
* Schedule delivery of amounts of proprietary compounds used during production from vendors to keep production runs on schedule and eliminating excess stock on hand or delayed production.
The company is starting the initial setup of their Dynamics 365 environment.

Answer:

Explanation:

 

NEW QUESTION 93
A company uses Discreet manufacturing concepts to produce cables. The company's production scheduler uses internal documents to track issues on in-process production orders.
The production scheduler must group all in-process production orders according to issues. The scheduler must be able to easily determine issues with production orders.
You need to implement a method to easily identify production orders with issues.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 94
You are a functional consultant for Contoso Entertainment System USA (USMF).
USMF plans to categorize a new night shift in its factory.
You need to create a new cost category named NightShift for the night shift.
To complete this task, sign in to Dynamics 365 portal.

Answer:

Explanation:
See explanation below.
* Go to Organization Administration
* Click New to create a new shared category.
* Give the shared category an ID and a name (NightShift).
* Select the Can be used in Production
* Back in Organization Administration Categories.
* Click New to create a new category.
* Select the Category ID from the shared category.
* The category will inherit the ID and name (Nightshift) from the shared category.
* Click Close to close the window.

 

NEW QUESTION 95
......


Difficulty in Writing Microsoft MB-320: Microsoft Dynamics 365 Supply Chain Management, Manufacturing Exam

Microsoft MB-320: Microsoft Dynamics 365 Supply Chain Management, Manufacturing is a privileged achievement one could be graced with. But adverse to the general notion certifying with Microsoft is not that challenging if the candidates have proper preparation material to pass the Microsoft MB-320: Microsoft Dynamics 365 Supply Chain Management, Manufacturing exam with good grades. Questions answers and clarifications which are designed in form of ITPassLeader dumps make sure to cover the entire course content. ITPassLeader have a brilliant MB-320 dumps pdf with the most recent and important questions and answers in PDF files. ITPassLeader is sure about the exactness and legitimacy of Microsoft MB-320: Microsoft Dynamics 365 Supply Chain Management, Manufacturing dumps and in this manner. Candidates can easily pass the Microsoft MB-320: Microsoft Dynamics 365 Supply Chain Management, Manufacturing exam with genuine Microsoft MB-320: Microsoft Dynamics 365 Supply Chain Management, Manufacturing dumps, and get MICROSOFT certification. These dumps are viewed as the best source to understand the Microsoft MB-320: Microsoft Dynamics 365 Supply Chain Management, Manufacturing well by simply pursuing examples questions, and answers. If a candidate completes practice the exam with certification MB-320 dumps along with self-assessment to get the proper idea on MICROSOFT accreditation and to ace the certification exam.


Who should take the Microsoft MB-320: Microsoft Dynamics 365 Supply Chain Management, Manufacturing Exam

The MB-320 exam test certification is an internationally-recognized certification that helps to have validation for those professionals who are keen to make their career in this domain. Candidates for this exam should be familiar with the work order lifecycle, capabilities for billing accounts, requirement groups concepts, and the technologies. Candidates should have some hands-on experience with resource scheduling optimization, schedule board implementation dispatch work orders. It is good for these candidates:

  • Fresher
  • IT Professional

 

Updated MB-320 Tests Engine pdf - All Free Dumps Guaranteed: https://www.itpassleader.com/Microsoft/MB-320-dumps-pass-exam.html

Latest Microsoft Dynamics 365 MB-320 Actual Free Exam Questions: https://drive.google.com/open?id=1osxxs0az9DTBllGIUhMVaa9k91KgKGW0

0
0
0
0