
Prepare Important Exam with C_IBP_2208 Exam Dumps(2022)
Pass Exam Questions Efficiently With C_IBP_2208 Questions
NEW QUESTION 36
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.
- A. Prioritization of demand elements one by one is achieved by unconstrained heuristics.
- B. Planning results can be generated faster by the optimizer.
- C. Push and Pull production models are used by the optimizer.
- D. Finite heuristics can achieve demand prioritization and pegging.
Answer: C,D
NEW QUESTION 37
Which of the following solutions are feasible when using the time series supply optimizer?Note: There are 3 correct answers to this question.
- A. Not respecting production capacity
- B. Violation of minimum aggregated inventory values
- C. Not adhering to maximum transport values
- D. Not-fully satisfied demands
- E. Violation of minimum resource utilization
Answer: B,D,E
NEW QUESTION 38
For your project, you create a new planning area and consider how to create analytics and alerts for it.How can you create these objects?
- A. Merge analytics and alerts into a new planning area from any sample planning area.
- B. Create analytics and alerts in the new planning area from scratch using the Intelligent Visibility application.
- C. Use the option for copying analytics and alerts when creating a new planning area from the sample SAPIBP1.
- D. Use the option for copying analytics and alerts into the new planning area from the existing custom planning area.
Answer: C
NEW QUESTION 39
You need to integrate data from SAP S/4HANA and legacy ERP to SAP IBP.What are the integration tools that you can use with such a setup for data transfer?Note: There are 2 correct answers to this question.
- A. Cloud Identity Authentication Service
- B. Cloud Integration for Data Services
- C. Real-time Integration
- D. Smart Data Integration
Answer: B,D
NEW QUESTION 40
Which of the following are capabilities of the Manage Forecast Error Calculations - Inventory Optimization app?Note: There are 2 correct answers to this question.
- A. Adjust Safety Stock Recommendations based on forecast error CV input
- B. Propagate forecast error to upstream locations in a supply chain network
- C. Adjust for forecast bias in Forecast Error CV calculations
- D. Identifiy intermittent demand for Forecast Error CV calculations
Answer: A,C
NEW QUESTION 41
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.
- A. You can add (or delete) planning objects to a planning view after these filters are applied.
- B. You can only apply one value-based filter per planning view.
- C. These filters can be used together with attribute totals in the same planning view.
- D. The alerts dashboard is not available if a value-based filter is set for the open planning view.
- E. These filters are always applied based on the values stored in the database.
Answer: B,D,E
NEW QUESTION 42
You are implementing SAP IBP to plan for a supply chain that experiences high seasonality.What supply planning operators can be used in your model to plan stock pre-builds?
- A. Supply optimizer and supply heuristics
- B. Finite heuristics only
- C. Supply optimizer only
- D. Finite and infinite heuristics
Answer: A
NEW QUESTION 43
You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.
- A. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
- B. Key figures can be calculated across different planning levels.
- C. The calculation chain for a key figure must always result in a calculated key figure.
- D. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
Answer: A,B
NEW QUESTION 44
The S&OP Operator Profiles app is used to configure different types of algorithms.Which algorithm-specific settings are unique for only the Time Series-based Supply Optimizer?Note: There are 2 correct answers to this question.
- A. Discretization
- B. Time profile level
- C. Processing mode
- D. Global cost factors
Answer: C,D
NEW QUESTION 45
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.
- A. Purge Key Figure Data
- B. Purge Master Data
- C. Purge Non-Conforming Data
- D. Create Time Periods for Time Profiles
Answer: A,B
NEW QUESTION 46
You are reviewing the master data types that are often used for supply and inventory planning
.Which master data types are compound master data types?Note: There are 2 correct answers to this question.
- A. SOURCELOCATION
- B. SOURCECUSTGROUP
- C. SOURCEPRODUCTION
- D. SOURCECUSTOMER
Answer: A,D
NEW QUESTION 47
What are some of the available ABC segmentation methods in SAP IBP?Note: There are 2 correct answers to this question.
- A. By Number of Items (Sorted Average)
- B. By Pareto Principle (Sorted and Cumulated %)
- C. By Pareto Principle (Sorted and Calculated Values)
- D. By Number of Items (Sorted Values)
Answer: C,D
NEW QUESTION 48
Which of the following approaches could you take to reduce run times of an optimizer?Note: There are 3 correct answers to this question.
- A. Split into multiple planning areas to support weekly vs. daily planning needs.
- B. Keep the number of fairshare segments small.
- C. Use non-overlapping networks by using subnetwork ID maintained at Location-Products to reduce the size of the problem.
- D. Increase the use of incremental lot size beyond the frozen horizon.
- E. Avoid using telescopic time buckets.
Answer: A,C,E
NEW QUESTION 49
Which SAP IBP planning operator can be run to delete planning objects in a certain version?
- A. Purge Key Figure Data
- B. Purge Non-Confirming Data
- C. Purge Master Data
- D. Purge Key Figure Data Outside Planning Area Planning Horizon
Answer: A
NEW QUESTION 50
What are the ways to achieve rolling aggregation with SAP IBP?
- A. Using a local member
- B. Using a key figure calculation
- C. Using a attribute as a key figure
- D. Using a appropriate period weight factor
Answer: D
NEW QUESTION 51
Forecast Error CV is an input to which of the following?
- A. Forecast Error Calculation in Inventory Planning Profile Operator
- B. Time-Series-Based Supply Planning Optimizer
- C. Multistage Inventory Optimization in Inventory Planning Profile Operator
- D. Calculate Target Inventory Components in Inventory Planning Profile Operator
Answer: C
NEW QUESTION 52
......
SAP C_IBP_2208 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
C_IBP_2208 Questions - Truly Beneficial For Your SAP Exam: https://www.itpassleader.com/SAP/C_IBP_2208-dumps-pass-exam.html
Download SAP C_IBP_2208 Sample Questions: https://drive.google.com/open?id=1EpVXS7tkA3HqECfMeTn1jXFMa9YSPTvj